Thresholds for Justifying a Permanent New School and Lead Time to First Primary 1 Intake
Published on: 10 Sep 2026
Name and Constituency of Member of Parliament
Ms Gho Sze Kee, Mountbatten
Question
To ask the Minister for Education (a) what demand and capacity thresholds the Ministry uses to determine when a new primary school is required in an area, including the projected size of the primary-school-age population and duration of demand needed to justify a permanent new school; and (b) what is the typical lead time from identifying the need to the school’s first Primary One intake.
Response
- Mr Speaker, MOE regularly reviews the demand and supply of primary school places at both the national and local levels. In doing so, we consider factors including the current and projected number of school-going children, planned housing developments, capacity in nearby schools, and accessibility for residents.
- As circumstances differ across areas, we do not just apply a single population threshold, or fixed duration of demand. Instead, we assess each case holistically, including the local context and projected longer-term demand.
- A new school requires substantial investment, and must have sufficient students over time to support a good range of educational programmes and co-curricular activities. We would therefore build one when we project that there will be a sustained demand that cannot be adequately met by nearby schools. Apart from building new schools, MOE may expand the capacity in existing schools where possible, to address short-term increase in demand in an area.
- From identifying the need for a new school to its opening, time is required for planning and design, construction, staff recruitment and pre-opening preparations. We generally do our projections and announce new school several years in advance of the first Primary One intake, to give parents and residents clarity on future school provision.